| Film identity and print side | Confirm polymer family, grade, coating or additive package, treated side, age, storage, and whether the roll was printed on the intended surface. Similar-looking films are not interchangeable evidence. | Supplier data, roll and batch identification, unprinted film, marked print side, storage history, and a known acceptable film if available. | Do not generalize a result from one film grade to all PE, PP, PET, or other film structures. |
|---|
| Surface treatment and cleanliness | Review treatment immediately before printing using the converter's controlled method, together with treatment uniformity, aging, handling, slip or bloom, dust, oil, and other contamination. | Treatment equipment status, onsite test records, time from treatment to print, surface map if available, and information on handling or contamination. | A nominal supplier value or old treatment record does not confirm the surface presented to the press today. |
|---|
| Ink system and intercoat compatibility | Confirm that the ink direction is intended for the film and print structure. Review white and color sequence, mixed ink systems, primer or varnish, rework additions, and whether a later color re-wets the first layer. | Product names and batches, color sequence, primer or varnish details, rework history, and samples showing which interface fails. | Film-to-ink adhesion and color-to-color adhesion should be evaluated separately. |
|---|
| Drying and transferred film | Check residual moisture, dryer and exhaust condition, line speed, transfer volume, solid coverage, overprint build, and whether the print cooled before winding or testing. | Press speed, drying path, transfer equipment, image coverage, print sequence, time to rewind, and time before adhesion evaluation. | A soft or incompletely dried film can look like adhesion failure; repeat the same test after controlled conditioning. |
|---|
| Test and downstream requirement | Define the actual approval test and later exposure. Tape, scratch, rub, lamination, sealing, heat, chemicals, filling, and package handling do not measure the same performance. | Written test method, conditioning time, acceptance reference, downstream materials and process, end-use description, and failed converted samples. | Approve against the real requirement; passing one informal test does not confirm the complete package structure. |
|---|